Here is a rendering of the Perry Road project for the press.
The ICF foundation is in and the slab goes down thursday. The plumber is putting the drains in to the septic and roughing for a future basement bathroom. We used Nudura ICFs which have 2 1/2" of foam inside and out. and a footing form that stays in place as a footing drain inside and out. We are putting 4" of foam under the slab and radiant tubing in the slab (in case we need it someday)